On Oktober, 14, 2011, the tunnelling team in Limmern reached the breakthrough of the first shaft with a specially designed Gripper-TBM for the excavation of a 40° slope.
Herrenknecht on top in a brand ranking, commissioned and published by the German WirtschaftsWoche magazine.