Your search: (no limitation)
Sungei Pandan River Cros...
Requirement
tunnelling project
| Employment | Electricity | |
|---|---|---|
| Geology | Limestone, loam, fine sand and silt | |
| Tunnel Length | 65 m, 580 m | |
| Diameter | 2,845 mm |
Solution
machine data
| Machine Type | EPB-Schild | |
|---|---|---|
| Support Techniques | Pipe Jacking | |
| Cutterhead Power | 250 kW | |
| Torque | 816 kNm |
For this project in Singapore, the machinery had to pass under a bay with difficult geology, in order to drill 2 tunnels for cables. At the same time, a horizontal and a vertical curve had to be drilled (a space curve).
The client decided to use a Herrenknecht EPB2000. The use of soil conditioning agents permitted a secure advance through limestone, loam, fine sand and silt. To counteract the heavy wear on the disks in the heterogeneous geology, additional wear plates were welded onto the cutterhead.