The German Federal Chancellor Dr. Angela Merkel and Chinese Premier Wen Jiabao visited the Herrenknecht plant (HTE) in Guangzhou on February 3, 2012.
On Oktober, 14, 2011, the tunnelling team in Limmern reached the breakthrough of the first shaft with a specially designed Gripper-TBM for the excavation of a 40° slope.