Turnkey multi-story car parks in city centers.

Lack of space in the city.
Since early 2007, more people live in towns than in the country. In major areas of population known as 'megacities', this fact poses significant problems for people and the environment alike. There is therefore an urgent need to keep pace with these new challenges as regards mobility and environmental protection. The new "U-Park" concept from Herrenknecht provides the intelligent solution. Various parking shafts below ground provide generous parking space for all types of private automobiles.
Herrenknecht U-Park helps create them.
The time-consuming search for somewhere to park in city centers will be a thing of the past. An intelligent, computer-controlled system installed at surface level ensures that the various parking shafts are filled efficiently from top to bottom. U-Park will have no effect on the external appearance of the city. The automobile is driven on to an automatic platform at surface level which then takes the vehicle down into the shaft. The automobile engine is switched off during the whole process. This dispenses with the need for installing expensive ventilation filtration systems during construction work in the shafts. A further environmental benefit.
Shaft construction is a combination of excavation and wall lining. At the same time as the earth is being broken up and removed from the groundwater-filled shaft by remote-control shaft drilling machinery, the walls of the shaft are being lined with pre-fabricated segments. This is a technically unique principle which protects the immediate vicinity of the site from critical drops in groundwater levels and guards against damage to buildings. The technology behind this controlled method of shaft construction not only saves time but provides a high level of safety for people and machinery.
Reference projects in Saudi Arabia, Russia, Kuwait, Indonesia and the Middle East highlight the development successes of Herrenknecht shaft drilling technology. It has already proved possible to sink several shafts at construction speeds of more than 3m / shift up to depths of 100m. The compact construction method and great flexibility of the shaft drilling equipment means that shaft drilling technology can be used even where conditions are very cramped.
Shaft sinking and lining in one package with Herrenknecht shaft drilling technology.
Installieren Sie den Flash Player um unsere Website in vollem Umfang genießen zu können.
Are you interested?
We will be delighted to help you if you have other questions on the subject of U-Park.