Logistics that’s fast and smart.
The transportation and logistics systems located downstream of the TBM need to be perfectly matched to the excavation rate of the tunnel boring machine. For example, powerful conveyor belt systems geared to the requirements of the construction site ensure that the material excavated by the TBM is carried away by the quickest, most direct and economic route. It may travel to a temporary store or final destination site some kilometers away outside the tunnel. Train, truck and transportation systems, whether rail-based or not, ensure that the rolling stock material or the lining segments are supplied to tunnel production "just in time".
See the homepage of our subsidiary H+E Logistik (www.helogistik.de) for information on smart conveyor belt systems.
For information on railroad carriages and road transportation vehicles suitable for tunnel construction, see the homepage (www.msd-dresden.de) of our MSD branch (Maschinen- und Stahlbau Dresden - Dresden machine and steel construction).




