Optimal handling of excavation tools.


One of the basic preconditions for successful tunnelling is the use of the right excavation tools. Herrenknecht does not only offer the tools, but also the service to go with them, from the provision of a customized cuttershop container on the site, the deployment of a cutter specialist to train the staff on site in repairs, through to remedial measures for cutter disks in a Herrenknecht cuttershop of the type existing in many regions already.

 

These services are rounded off by our technical support for the optimum utilization, project-specific designs and the preparation of suitable excavation strategies to minimize wear. In addition to the delivery of excavation tools we also offer them from consignment stock on site or in the form of a running meter contract. This includes tooling with spare parts and stock keeping.

 

If you have any further questions concerning excavation tools, please contact

 

traffic(at)herrenknecht.de for Traffic Tunnelling, or 

utility(at)herrenknecht.de for Utility Tunnelling.

GOTTHARD BASE TUNNEL: MECHANIZED TUNNELLING COMPLETED ON THE NORTH SIDE.

Six months ahead of schedule the Herrenknecht Gripper TBM reaches breakthrough in the western tube from Erstfeld to Amsteg.

HERRENKNECHT SEPARATION PLANTS.

Herrenknecht offers its customers innovative separation plants which are optimally designed for slurry supported tunnelling technology for Utility Tunnelling and Traffic Tunnelling.