Services Included.

 

Core competencies of UTS AG comprise the complete range of engineering services, customer support and supervision during the construction of mechanized tunnel drives.

 

  • Full Service Provider (Rental of tunnelling equipment, personnel, spare & wear parts, excavation tools)
  • Engineering consultancy covering all the major systems required to ensure the efficient operation of the tunnelling jobsite (site installations, organizational structure, shift models, tunnelling program)
  • Operational support to optimize the tunnelling process, particularly focusing on the coordination of the interfaces between TBM technology, construction and logistics during tunnelling
  • Preventive maintenance program for the complete tunnel boring machine and integrated technical management systems to monitor spare parts and cutting tools consumption (guidelines and recording)
  • TBM operation, performance related contracts
  • Solution-oriented support to overcome any problems which may occur during tunnel construction
  • Interface to other Suppliers (e.g. rolling stock, formwork, conveyor belt systems)

CONVERTIBLE MIXSHIELD IS BORING ITS WAY THROUGH ZURICH’S UNDERGROUND

The construction of the tunnel is making good progress. More than 4 kilometers of the Weinberg tunnel have already been completed.