Services Included.

 

Core competencies of UTS AG comprise the complete range of engineering services, customer support and supervision during the construction of mechanized tunnel drives.

 

  • Full Service Provider (Rental of tunnelling equipment, personnel, spare & wear parts, excavation tools)
  • Engineering consultancy covering all the major systems required to ensure the efficient operation of the tunnelling jobsite (site installations, organizational structure, shift models, tunnelling program)
  • Operational support to optimize the tunnelling process, particularly focusing on the coordination of the interfaces between TBM technology, construction and logistics during tunnelling
  • Preventive maintenance program for the complete tunnel boring machine and integrated technical management systems to monitor spare parts and cutting tools consumption (guidelines and recording)
  • TBM operation, performance related contracts
  • Solution-oriented support to overcome any problems which may occur during tunnel construction
  • Interface to other Suppliers (e.g. rolling stock, formwork, conveyor belt systems)

ZURICH: SUCCESSFUL BREAKTHROUGH.

On November 22, 2010, the miners and the Herrenknecht Mixshield S-451 achieve breakthrough at Zurich Central Station.