This website uses cookies. For more information check our policy.

Agree

Pearl River Delta Water Resources Allocation Project
China, Guangzhou
2018 – today

The Pearl River Delta is one of the most densely populated areas in the world and one of China's most important economic centers. The water supply for the steadily growing population of the region has to be continuously expanded. The regions of Guangzhou, Shenzhen and Dongguan and Hong Kong are already threatened by drought.


The Pearl River Delta Water Resources Allocation Project is designed to channel water from the Xijiang River in the west to the Dongjiang River in the east. This will prevent water scarcity and create a water reservoir for Hong Kong for emergencies.


A Herrenknecht EPB Shield was chosen for the project. The tunnel boring machine with a diameter of 6,250 mm excavates a section 1,666 meters in length.

Data Sheet

Country, Location

China, Guangzhou

Year

2018 – today

Application

Water

Geology

Soft ground

Tunnelling length

1,666 m

Machine Data

1x EPB Shield:
Diameter: 6,250 mm
Lining method: Segmental lining
Cutterhead power: 990kW

Your contact person Contact us

Jack Brockway President and CEO Herrenknecht Tunnelling Systems USA Inc.
Gerhard Goisser COO Herrenknecht Tunnelling Systems USA, Inc.