Vienna Metro
Austria, Vienna
2003 – 2005

Around 1.4 million people currently use the metro in Vienna every day. At the moment the Vienna metro network comprises five lines, 101 stations and an operating length of 74 kilometers. The intention is to expand the metro network to 90 kilometers and 116 stations by 2019.

In the course of the third stage of expansion Herrenknecht Mixshield technology was employed for two sections. For the extension of Line U1 (North) the S-222 excavated in 2003 within only nine months a tunnel of 824 meters through sand and gravel. The S-227 started tunnelling in January 2005 for the extension of the Line U2 and crossed the finish line after eight months and 1,728 meters in August 2005.

Data Sheet

Country, Location

Austria, Vienna

Year

2003 – 2005

Application

Metro

Geology

Heterogeneous ground
Silty sand, gravel, sand with boulders

Tunnelling length

2,552 m

Machine Data

2x Mixshield:
Diameter: 6,800 mm
Lining method: Segmental lining
Cutterhead power: 440 kW
Torque: 2,257 kNm

Your contact person Contact us

Steffen Dubé President and General Manager Herrenknecht Tunnelling Systems USA Inc.
Gerhard Goisser Commercial Manager Herrenknecht Tunnelling Systems USA, Inc.