The existing sewage system in Waldbronn (Baden, Germany) was planned to be relieved during heavy rains in order to protect the pipes against damage. For this, an Earth Pressure Balance Shield was used for the construction of a combined sewer system in Waldbronn.
 
Due to unexpected hard-rock formations, a partial-face excavator could not be used as planned for economic reasons. The Community of Waldbronn opted for a full-face machine, an EPB2000TB. The micromachine with a diameter of 2.38 meters bored its way through 340 meters of hard sandstone until the end of January 2008.

Data Sheet

Country, Location

Germany, Waldbronn

Year

2008

Application

Sewage

Geology

Rock
Sandstone

Tunnelling length

340 m

Machine Data

1x EPB Shield:
Diameter: 2,380 mm
Lining method: Pipe jacking
Cutterhead power: 250 kW
Torque: 820 kNm

Your contact person Contact us

Steffen Dubé President and General Manager Herrenknecht Tunnelling Systems USA Inc.
Gerhard Goisser Commercial Manager Herrenknecht Tunnelling Systems USA, Inc.