Novaliches-Balara Aqueduct Water for millions The fourth Novaliches-Balara Aqueduct (NBAQ4) serves around seven million customers in the Philippine capital. It is designed to last…
Read moreThe 125 km long Rishikesh-Karnaprayag rail line project, with 12 stations, 35 bridges, and more than 100 km of tunnel, is making swift progress. This rail link aims to provide…
Read moreThe number of offshore installations for expanding the use of renewable energy and the construction of coastal infrastructure has grown rapidly in recent years. As a result, demand…
Read moreLaying power cables in a Natura 2000 nature reserve calls for innovative solutions. The hybrid version of the Herrenknecht HDD rig HK150T is one. A diesel power pack is only needed…
Read moreExpansion of the Rome metro - an urgently required measure in view of endless traffic congestion on city bound and out-bound roads. And a challenging measure at the same time: the…
Read moreA superhighway for sewage treatment The Herrenknecht Mixshield S-1144 with a diameter of 4.86 meters drives approx. 2.8 kilometers of sewage tunnel for Phase 2 of the Deep Tunnel…
Read moreBella and Vida are the two new big stars in Melbourne. The two tunnel boring machines (TBMs) from Herrenknecht are boring the urgently needed West Gate Tunnel. The infrastructure…
Read moreThe 16.9 km long Gotthard road tunnel needs to be closed to traffic during renovation work necessitated by its age. To ensure the important north-south connection can nevertheless…
Read moreTransport for London (TfL) is building a new 1.4 km twin-bore road tunnel under the River Thames in East London. The Silvertown Tunnel will link the A1020 road in Silvertown,…
Read moreHigh Speed Two (HS2) is a high-performance, low-carbon rail link being built between England's North and London. The first section of Britain’s new high-speed railway runs from…
Read more